|
|
For the design of new pump projects and the development of the existing ones we use valuable contributions:
- A data store based on previous experience and continuously updated with feedback from the most recent achievements and customers installation.
- A constant monitoring of new materials and metallurgical treatments available on the market.
- The use of modern workstations with the latest simulation software and mechanical design of three-dimensional (FEM, CAD) that allow to reduce time of the prototypes construction and testing.
- Hydraulic test bench to verify the main parameters of the project.
|
|